Polin Aquariums is happy to announce another aquarium project successfully finished in Turkey, Trabzon Aquarium is open to the public now. It has the importance of being the first aquarium in the Black Sea region. Also, this is the first aquarium built inside a tunnel connecting the Zagnos and Tabakhane valleys of Trabzon. The aquarium stands as a landmark between these valleys. It is the first and only such exhibit in the world. 

The aquarium floor area is 3500 m² with 8 different zones. From the entrance, guests will enjoy the world’s lakes and rivers which display different species from the Amazon River, Lake Tanganyika, and Lake Malawi. Following lakes and rivers, the terrarium zone is displaying reptiles from different areas. The experience zone of the aquarium shows guests the daily routine of the aquarists and biologists.

The fourth zone of the aquarium consists the different fish species from different seas. Following that zone, the Shark Hall provides information about shark anatomy, their habitats, and all educational content related to one of the most extraordinary creatures of our world.

The touch and discover zone will serve as another educational zone with many different encounter experiences for the guests. Before the main attraction of the aquarium, the caved zone will consist of different species from the deep waters of our seas.

Finally, a 21 meters long tunnel awaits the guests at the end of the aquarium. This tunnel aquarium consists mainly of all aquatic animals from the Turkish seas.

Über Polin Waterparks /Gebkim OSB

Polin Aquariums designs and builds public aquariums, taking them from initial concept and architecture to construction, business plan, procurement of living creatures and development of brand identity. It aims to achieve excellence with its team of the experienced architects, engineers, biologists, veterinarians and technical experts. The secret to the success of these attraction centers comes from this integrated setup developed through experience.

Designing and building a public aquarium is much different than constructing a regular reinforced concrete building. Every aspect of the building’s infrastructure such as reinforced concrete construction, mechanical applications, electrical systems and information technology systems must be developed based on the project concept and its technical specifications. With 18 different aquarium projects carrying a total of more than 35 million liters of water and more than 16 million visitors by the end of 2021, Polin Aquariums are at the forefront of the industry. More

For more info, visit www.polinaquariums.com or contact aquariums@polin.com.tr.

Firmenkontakt und Herausgeber der Meldung:

Polin Waterparks /Gebkim OSB
Refik Baydur 6
TR41480 Dilovasi/Kocaeli
Telefon: +90 (262) 6566467
Telefax: +90 (262) 65664-75
http://www.polin.com.tr

Für die oben stehende Pressemitteilung ist allein der jeweils angegebene Herausgeber (siehe Firmenkontakt oben) verantwortlich. Dieser ist in der Regel auch Urheber des Pressetextes, sowie der angehängten Bild-, Ton-, Video-, Medien- und Informationsmaterialien. Die United News Network GmbH übernimmt keine Haftung für die Korrektheit oder Vollständigkeit der dargestellten Meldung. Auch bei Übertragungsfehlern oder anderen Störungen haftet sie nur im Fall von Vorsatz oder grober Fahrlässigkeit. Die Nutzung von hier archivierten Informationen zur Eigeninformation und redaktionellen Weiterverarbeitung ist in der Regel kostenfrei. Bitte klären Sie vor einer Weiterverwendung urheberrechtliche Fragen mit dem angegebenen Herausgeber. Eine systematische Speicherung dieser Daten sowie die Verwendung auch von Teilen dieses Datenbankwerks sind nur mit schriftlicher Genehmigung durch die United News Network GmbH gestattet.

counterpixel